首页> 外文期刊>Electric Perspectives >Nuclear Forces Ahead
【24h】

Nuclear Forces Ahead

机译:未来核力量

获取原文
获取原文并翻译 | 示例
           

摘要

In addition to thousands of tons of reinforcing steel and concrete, nuclear plants need heavy nuclear components, also called ultra large forgings. During the last nuclear buildout, nuclear constructors imported many of those ultra large forgings from other countries such as Japan and France. But now,rnas companies make plans to build new nuclear plants in the next decade, some companies are preparing for the potential of a long-term nuclear boom by investing in component manufacturing facilities now. Once projects get the green light and are able to break ground, at least four new U.S. facilities will be able to provide many of the components for the first nuclear powerplants to be built in this country in more than 10 years.rn"These companies are committing to large investments, which shows they believe these nuclear plants will come online at some point," says
机译:除了数千吨的钢筋和混凝土,核电站还需要重型核部件,也称为超大型锻件。在上一次核扩建期间,核制造商从日本和法国等其他国家进口了许多超大型锻件。但是现在,rnas公司计划在未来十年内建造新的核电站,一些公司正在通过投资组件制造设施为长期核繁荣的潜力做准备。一旦项目获得批准并能够破土动工,美国至少有四个新设施将能够为该国十多年来建造的第一座核电站提供许多组件。承诺进行大规模投资,这表明他们相信这些核电站将在某个时候上线。”

著录项

  • 来源
    《Electric Perspectives》 |2009年第1期|18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号