Utilities Can Improve Power Plant Efficiency, Become Emission-compliant in Short Term

机译:公用事业可以提高电厂效率,在短期内达到排放标准

获取原文
获取原文并翻译 | 示例
           

摘要

New coal-fired plant construction costs some $2 million to $3 million per megawatt. A new facility then must be staffed and operated with new resources and additional fuel consumption. A similar-sized combined-cycle gas turbine (CCGT) plant costs about $1 million per megawatt in construction costs. Coal-fired generation is under considerable pressure from tightening air pollution control standards and fuel-price competition from natural gas. During the past five years, the financial community has made clear it is unwilling to finance any new large-scale, coal-fired generating facilities. An allternative to decommissioning old plants or con-structing new ones is to retrofit an existing coal-fired or oil-fired plant to burn natural gas. This is not the most energy-efficient use of natural gas, but it might turn out to be the most economically feasible approach to clean up an existing coal fleet without investing hundreds of millions or even billions of dollars for back-end pollution control equipment.
机译:新的燃煤电厂建设成本为每兆瓦200万至300万美元。然后,必须为新设施配备人员并使用新资源和额外的燃料消耗进行操作。一家类似规模的联合循环燃气轮机(CCGT)电厂每兆瓦的建设成本约为100万美元。严格的空气污染控制标准和天然气的燃料价格竞争给燃煤发电带来了巨大压力。在过去的五年中,金融界已经明确表示不愿意为任何新的大型燃煤发电设施提供资金。淘汰旧工厂或建造新工厂的一种替代方法是改造现有的燃煤或燃油工厂以燃烧天然气。这不是最节能的天然气使用方式,但可能证明它是清理现有煤炭车队的最经济可行的方法,而无需投资数亿甚至数十亿美元用于后端污染控制设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号