An Allegory of Uncertainty for Base Load Generation

机译:关于基本负载生成的不确定性的寓言

获取原文
获取原文并翻译 | 示例

摘要

Investment in U.S. base load generation is risky business due to uncertainty in energy prices, carbon policy and regulatory oversight. Demand for electricity continues to grow, reserve margins shrink, and yet announced investments in base load units are cancelled or delayed. Tightened supply exacerbates price volatility, while political and regulatory activities increase risk to generation investments without promising the requisite returns. With so many mixed signals, industry participants may feel as if they are part of Dante's "Divine Comedy," alternating among the 13th century canticas of heaven, hell and purgatory. Within this saga, how can utilities make long-range plans to meet demand? If regulatory assurances are not enough, real options theory may unlock investment in base load generation.
机译:由于能源价格,碳政策和监管的不确定性,对美国基本负荷发电的投资是有风险的业务。电力需求持续增长,储备利润率下降,然而宣布的对基本负荷单位的投资被取消或延迟。供应吃紧加剧了价格波动,而政治和监管活动却增加了发电投资的风险,却没有保证必要的回报。面对如此多的混杂信号,行业参与者可能会感觉好像他们是但丁的“神曲”的一部分,在13世纪的天堂,地狱和炼狱中交替出现。在这个传奇中,公用事业如何制定长期计划以满足需求?如果监管保证不够,实物期权理论可能会释放基本负荷产生方面的投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号