...
首页> 外文期刊>Electric light & power >Cost-effective Way to Meet RPS? Transmission Build-Out
【24h】

Cost-effective Way to Meet RPS? Transmission Build-Out

机译:具有成本效益的方式来满足RPS?变速箱外扩

获取原文
获取原文并翻译 | 示例

摘要

Aggressive renewable portfolio standards (RPS) necessitate additional development of renewable generation sources. State regulators should pursue holistic approaches to bring new renewable generation online while minimizing ratepayer cost and grid instability. As part of this approach, regulators should evaluate whether interstate transmission build-out can meet state energy policy goals at lower cost than simply building in-state renewable generation. Although state RPS are by definition political implements enacted at the state level, the physics of power fail to respect state boundaries. The localization of the best sources of renewable generation engenders additional cost and grid stability concerns. In particular, because renewable generation sources are heavily localized, the lowest-cost renewable power necessary to satisfy a state's RPS might be outside that state.
机译:积极的可再生能源投资组合标准(RPS)要求进一步开发可再生能源。州监管机构应采取整体方法,使新的可再生能源发电上网,同时最大程度地降低纳税人成本和电网不稳定。作为此方法的一部分,监管机构应评估州际传输的扩建是否能以比简单建设州内可再生能源发电低的成本满足州能源政策目标。尽管国家RPS无疑是在州一级制定的政治工具,但权力的物理学未能遵守国家边界。最佳可再生能源的本地化带来了额外的成本和电网稳定性问题。特别是,由于可再生能源的来源非常集中,满足州的RPS所需的最低成本的可再生能源可能不在该州之外。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号