首页> 外文期刊>The economist >Underground; overbudget
【24h】

Underground; overbudget

机译:地下;超过预算

获取原文
获取原文并翻译 | 示例
           

摘要

Telling long-suffering commuters on London's Underground that the disruptions and line closures that blight the system are about to get worse is not likely to cheer them up, even if they are necessary to upgrade the system. So when Ken Livingstone, London's mayor, made exactly that announcement on April 24th he was keen to point to improvements that had already been made. He reminded the assembled journalists of the extra carriage now attached to each train on the Jubilee line, added without a hitch over Christmas. A fifth of the network's stations have been smartened up, he said, and most of the improvements to the Waterloo & City line (which, admittedly, serves only two stations) are complete.
机译:告诉伦敦地下地铁上饱受折磨的通勤者,使该系统恶化的中断和线路关闭将不会使他们振作起来,即使它们是升级系统所必需的。因此,当伦敦市长肯·利文斯通(Ken Livingstone)于4月24日做出这一宣布时,他渴望指出已经做出的改进。他提醒集会的记者,现在银禧线上的每列火车都附加了额外的车厢,圣诞节期间也毫无阻碍。他说,已经改善了该网络五分之一的站点,并且对Waterloo&City线路(公认的仅服务于两个站点)的大部分改进工作已经完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号