...
首页> 外文期刊>Dredging & port construction >North Sea defences move on apace
【24h】

North Sea defences move on apace

机译:北海防御迅速发展

获取原文
获取原文并翻译 | 示例
           

摘要

Defences at Clacton and Holland-on-Sea on the UK's Essex coast were in a poor condition with a severely depleted beach offering little protection - but a 5 km-long coastal scheme is changing that. The project, for Tendring District Council (TDC), was awarded to VBA JV, a consortium comprising VolkerStevin, Boskalis Westminster, and Atkins, which was set up to secure contracts through the Water and Environmental Management Framework, the third-generation framework for the delivery of UK Environment Agency projects. "As the lead coastal partner within VBA, the works at Clacton and Holland-on-Sea are being undertaken entirely by Boskalis Westminster on behalf of VBA," a Boskalis representative told IHS Maritime. He explained that the 5 km original sea frontage had a promenade with a multitude of sea defences in poor condition. "The low beach levels also limited the seafront's amenity value and, apart from long-term sea defences, the scheme will encourage regeneration in the district," he said.
机译:英国埃塞克斯(Essex)海岸的克拉克顿(Clacton)和荷兰海上(Holland-on-Sea)的防御状况很差,海滩严重枯竭,几乎得不到任何保护-但5公里长的沿海计划正在改变这一状况。面向Tendring区议会(TDC)的项目已授予VBA JV,该联盟由VolkerStevin,Boskalis Westminster和Atkins组成,旨在通过水资源和环境管理框架(该框架的第三代框架)获得合同交付英国环境署的项目。 “作为VBA的主要沿海合作伙伴,Clacton和Holland-on-Sea的工程完全由Boskalis Westminster代表VBA进行,” Boskalis的代表告诉IHS Maritime。他解释说,原始的5公里长的临海路有一条长廊,条件恶劣,海防设施众多。他说:“低海滩水平也限制了沿海地区的便利设施价值,除了长期的海上防御外,该计划还将鼓励该地区的复兴。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号