...
首页> 外文期刊>Dredging & port construction >Lower Mississippi steps closer to 15m
【24h】

Lower Mississippi steps closer to 15m

机译:下密西西比州更接近15m

获取原文
获取原文并翻译 | 示例

摘要

US ports on the lower Mississippi River cannot yet accommodate Capesize and large post-Panamax vessels, but the Obama administration is taking steps to see that they can, John Gallagher reports. The US Army Corps of Engineers revealed on 13 May its plans to begin a USD3 million environmental report that will assess deepening the Mississippi River between Baton Rouge, Louisiana, and the Gulf of Mexico from 13.7 m to 15.2 m. While the length of the channel from Baton Rouge to the Gulf is approximately 410 km, less than one-third of that distance would actually have to be dredged - much of the river is maintained to at least 14.3 m and thus can already accommodate larger oceangoing vessels.
机译:约翰·加拉格尔(John Gallagher)报道,密西西比河下游的美国港口尚无法容纳好望角型和大型巴拿马型船,但奥巴马政府正在采取措施,确保它们能装上。美国陆军工程兵部队于5月13日披露了计划启动一份300万美元的环境报告的计划,该报告将评估密西西比河在巴吞鲁日,路易斯安那州和墨西哥湾之间的加深程度,从1370 m到15.2 m。尽管从巴吞鲁日到墨西哥湾的航道长度约为410公里,但实际上距离该距离的不到三分之一-大部分河流都维持在至少14.3 m,因此已经可以容纳更大的航程船只。

著录项

  • 来源
    《Dredging & port construction 》 |2015年第julaspeca期| 7-7| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号