首页> 外文期刊>District energy >TECO, Burns & McDonnell Complete System Expansion at Texas Medical Center
【24h】

TECO, Burns & McDonnell Complete System Expansion at Texas Medical Center

机译:TECO,Burns&McDonnell在德克萨斯医疗中心完成系统扩展

获取原文
获取原文并翻译 | 示例
       

摘要

Thermal Energy Corp. (TECO) Board Chairman Paul G. Bell Jr. pulled the lever at May 17's ceremonial startup of TECO's new chillers, which were installed as part of its $377 million expansion project on the Texas Medical Center campus in Houston. The rest of the board members and guests looked on. TECO and Burns & McDonnell hosted the dedication ceremony, "The Energy Behind What's Next," in TECO's new East Chiller Building to celebrate completion of the system expansion, Master Plan Implementation Project - Phase One (see cover story).
机译:Thermal Energy Corp.(TECO)董事会主席Paul G. Bell Jr.在5月17日举行的TECO新型冷水机的启动仪式上拉开了杠杆,这些冷水机是其在休斯敦德州医学中心校园进行的3.77亿美元扩建项目的一部分。其余董事会成员和来宾进行了观察。 TECO和Burns&McDonnell在TECO新的East Chiller大楼内举行了“下一步的能源”奉献仪式,以庆祝系统扩展的总体规划实施项目-第一阶段(请参见封面故事)。

著录项

  • 来源
    《District energy》 |2011年第3期|p.59|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:23:42

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号