首页> 外文期刊>Developing Country Studies >Assessing the Challenges of Electricity Service Delivery Process: The Case of Shashego Woreda Electricity Sector, Hadiya Zone, Southern Ethiopia
【24h】

Assessing the Challenges of Electricity Service Delivery Process: The Case of Shashego Woreda Electricity Sector, Hadiya Zone, Southern Ethiopia

机译:评估电力服务交付过程的挑战:Shashego Woreda电力部门,Hadiya区,埃塞俄比亚

获取原文
       

摘要

The main objective of this study was to assess the challenges of electricity service deliver process. Both quantitative and qualitative approaches were used for this study. This includes questionnaires, focused-group discussions, structured or semi-structured interviews, which are used as crucial data collection instrument. The sample size of this study was 384. Systematic random sampling was used to represent the households as part of the study. This was selected from Doisha and Bonosh twon residents. The Electricity sector is affected by lack of transparency, responsiveness, Moreover, the access to electricity is very low in this study area. For instance, the problem however is with the supply that breaks off basis due to power interruption. This, as about 58 per cent of respondents reported, occurs at least once in a week.
机译:本研究的主要目标是评估电力服务的挑战。 这项研究使用了定量和定性方法。 这包括问卷调查,集中组讨论,结构化或半结构化访谈,其被用作至关重要的数据收集仪器。 本研究的样本量为384.系统随机抽样用于将家庭作为研究的一部分代表。 这是选自Doisha和Bonosh Twon居民。 电力部门受缺乏透明度的影响,响应能力,这一研究区内的电力非常低。 例如,问题然而,由于电源中断,该供电是断开的。 这是约58%的受访者报告,每周至少发生一次。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号