首页> 外文期刊>Engineering and Applied Science Research >An integrated model of preventive maintenance and safety stock for a used production unit under leasing
【24h】

An integrated model of preventive maintenance and safety stock for a used production unit under leasing

机译:租赁下使用生产单位预防性维护和安全股的综合模型

获取原文
       

摘要

In this paper, we propose an integrated model of preventive maintenance (PM) and safety stock for an unreliable production unit, subject to random failures, acquired by leasing. Maintenance activities, both preventive and corrective, are performed by the lessor under the lease contract, incurring maintenance costs to the lessor. The leased production unit is used by the lessee to produce parts for the subsequent production stage. To prevent the subsequent production stage from being interrupted during breakdowns and PM, the lessee must produce a certain amount of safety stock, incurring inventory costs to the lessee. Unlike other models in the literature that implicitly assume that the leased production unit is a new item, in this paper, we investigate the case where the leased production unit is one that has already been used. In this case, the lessor can perform reconditioning, prior to leasing, on the production unit being leased incurring a reconditioning cost to the lessor. A mathematical model is developed to determine the optimal PM cycle duration, reconditioning level, and safety stock size to minimise the total expected cost to the lessor and the lessee combined over the leasing horizon. The numerical results show that calculating the optimal values of all three decision variables by considering the lessor and the lessee simultaneously yields a more satisfactory result, in terms of the total expected cost over the leasing horizon, than when the parties are considered individually. Some managerial insights useful to both the lessor and the lessee are provided in the sensitivity analysis section.
机译:在本文中,我们提出了一种通过租赁获得的随机失败的不可靠的生产单元的预防性维护(PM)和安全库存综合模型。维护活动,预防性和纠正,由租赁合同下的租赁服务,导致遗弃费用。承租人使用租赁的生产单元以生产后续生产阶段的零件。为了防止随后的生产阶段在故障和下午中断,承租人必须产生一定数量的安全库存,导致承租人的库存成本。与文献中的其他模型不同,隐含地假设租赁的生产单元是一个新项目,在本文中,我们调查租赁生产单位是已经使用的情况。在这种情况下,在租赁之前,产品可以在租赁之前进行修复,该生产单元被租赁到遗传的再处理成本。开发了一种数学模型来确定最佳PM循环持续时间,再现水平和安全储存量,以最大限度地减少投资者的总预期成本,并且承租人组合在租赁地平线上。数值结果表明,通过考虑租约和承租人同时计算所有三个决策变量的最佳值,就租赁地平线上的总预期成本而言,比各方被单独考虑的总成本。对吸引者和承租人有用的一些管理洞察力在敏感性分析部分提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号