...
首页> 外文期刊>Inside Missile Defense >GAO recommends more transparency on Next-Gen OPIR schedule risks
【24h】

GAO recommends more transparency on Next-Gen OPIR schedule risks

机译:高推荐更多关于下一代OPIR计划风险的透明度

获取原文
获取原文并翻译 | 示例

摘要

A new report from the Government Accountability Office once again sheds doubt on the Space Force's schedule for the Next-Generation Overhead Persistent Infrared program - despite insistence from the service that its schedule remains on track to begin launching the satellites in fiscal year 2025. The report, released today, reiterates a message the agency has been transmitting for several years, saying the service's plans are overly optimistic and its schedule targets "unlikely." In a June report, GAO predicted a two-year delay to the launch timeline linked to payload development and integration risk. The Space Force, however, contends that the program has a measured approach to risk-reduction. Program Executive Officer for Space Development Col. Brian Denaro told reporters in August a recent critical design review did not indicate any schedule issues. Denaro said he thinks the disconnect between GAO's assessment and his office's outlook is tied to proximity to the program. Other agencies are relying, in part, on "historical parametric data" based on the service's performance on other programs.
机译:政府责任办公室的一份新报告再次对下一代开销持久性红外程序的空间力量进行了怀疑 - 尽管这项服务坚持到其日程安排在2025财年开始在轨道上开始启动卫星。该报告今天发布的,重申代理商已经传播了几年的邮件,称服务的计划过于乐观,其安排目标“不太可能”。在6月份的报告中,GAO预测了与有效载荷开发和集成风险相关的发布时间表的两年延迟。然而,空间力争辩说程序具有测量的风险减少方法。 Space Development Col. Brian Denaro的计划执行官在八月告诉记者最近的一个关键设计审查并未表明任何计划问题。 Denaro表示,他认为高对GAO之间的脱节,他的办公室前景与该计划的靠近联系在一起。根据服务在其他程序的性能,其他机构部分地依赖于“历史参数数据”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号