首页> 外文期刊>Civil Eengineering >Design and construction of a concrete tied-arch bridge in Ashton, Western Cape
【24h】

Design and construction of a concrete tied-arch bridge in Ashton, Western Cape

机译:西开普省阿什顿混凝土镶拱桥的设计与施工

获取原文
           

摘要

This original bridge structure has reached the end of its functional service life (Ronné et al., 2018) and will be replace with a new tied-arch bridge comprising a cable-supported concrete deck which spans 110 m between bearings and arching ribs which rise 22 m above the asphalt road surface.The superstructure, which was completed mid-2020, adjacent to the existing road-alignment, will be transversely jacked to its final position after completion of the substructure. This operation is currently scheduled for the second half of 2021.
机译:这种原始桥梁结构已达到其功能性使用寿命的结束(Ronné等,2018),并将用新的绑架拱桥更换,包括电缆支撑的混凝土甲板,其在轴承和拱形肋骨之间跨越110米 22米以上沥青路面。在2020年中期完成的上层建筑,与现有的道路对齐相邻,将在完成后结构后横向抬起其最终位置。 该操作目前安排在2021年的下半部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号