...
首页> 外文期刊>Global Water Intelligence >New models to tackle India's wastewater gap
【24h】

New models to tackle India's wastewater gap

机译:以解决印度的废水差距的新车型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

India's Central Pollution Control Board (CPCB) has published the first new inventory of sewage treatment plants in six years, revealing a nationwide gap of 40.6 million m~3/d in urban areas between the volume of wastewater produced and installed treatment capacity. While the percentage of untreated wastewater has reduced from 62% in 2015 to 56% thanks to the commissioning of around 9 million m~3/d of new capacity, the absolute gap has actually increased slightly, from 39 million m~3/d. With the country's largest states accounting for a significant portion of the shortfall, there could be opportunities for private investors and water sector players to create new bankable projects. especially with a number of the largest utilities planning to reuse treated effluent to reduce freshwater needs.
机译:印度的中央污染控制委员会(CPCB)已在六年内发表了第一个新的污水处理厂库存,揭示了在生产和安装处理能力的废水量之间的城市地区4060万米〜3 / d的全国性差距。 虽然未经处理的废水的百分比从2015年的62%降低到56%,但由于调试大约900万M〜3 / d的新能力,绝对差距实际上略有增加,从3900万M〜3 / d略有增加。 随着该国最大的州占缺口的重要部分,可能会有私人投资者和水部门参与者创造新的便携式项目的机会。 特别是许多规划的最大公用事业公司重用治疗的流出物,以减少淡水需求。

著录项

  • 来源
    《Global Water Intelligence》 |2021年第7期|34-35|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号