首页> 外文期刊>E3S Web of Conferences >Research on Construction Crack Diagnosis and Treatment Technology of Double-Column Large Cantilever Pre-Stressed Bent Cap
【24h】

Research on Construction Crack Diagnosis and Treatment Technology of Double-Column Large Cantilever Pre-Stressed Bent Cap

机译:双柱大悬臂预应力弯曲帽的施工裂纹诊断与处理技术研究

获取原文
       

摘要

This paper took a pre-stressed bent cap of a high pier of a bridge as the research object, expounded the crack type and construction process of the bent cap, combined with the numerical calculation and analysis of the construction process to study the crack generation mechanism and its influence during the construction period of the bent cap. Besides, it gave the repair and treatment technology of jacking and unloading combined with pressure glue, so as to provide reference for the disease diagnosis and treatment of similar bridge structures.
机译:本文采用了一座高码头的预应力弯曲盖,作为研究对象,阐述了弯曲帽的裂缝型和施工过程,结合了施工过程的数值计算和分析,研究了裂缝发电机制 及其在弯曲帽施工期间的影响。 此外,它提供了千斤顶和卸载的修复和处理技术与压力胶,以便为类似桥梁结构的疾病诊断和治疗提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号