首页> 外文期刊>E3S Web of Conferences >Study on Risk Identification and Key Risks of Prefabricated Building Supply Chain Based on Grounded Theory
【24h】

Study on Risk Identification and Key Risks of Prefabricated Building Supply Chain Based on Grounded Theory

机译:基于接地理论的预制建筑供应链风险识别与关键风险研究

获取原文
       

摘要

Supply chain management is an important challenge faced by prefabricated buildings. The transfer of prefabricated modules will inevitably be accompanied by the transmission and diffusion of risks. It is precisely because of the inherent characteristics of the prefabricated building supply chain risks that the current prefabricated building completion rate is low. Based on this, the Grounded Theory is used to identify the risks of prefabricated construction projects from the perspective of the supply chain, and build a full-stage risk system; and introduce the Interpretation Structure Model Theory to analyze the interrelationship between risk factors, and obtain different risk levels; finally, specific risk control measures are proposed for deep-seated factors, which provide new ideas for the development of prefabricated buildings.
机译:供应链管理是预制建筑面临的重要挑战。 预制模块的转移将不可避免地伴随着风险的传输和扩散。 正是由于预制建筑供应链风险的固有特性,即当前预制的建筑工程率低。 基于这一点,基于基于此基础理论,用于从供应链的角度来确定预制建设项目的风险,并建立全阶段风险系统; 并介绍解释结构模型理论,分析风险因素之间的相互关系,并获得不同的风险水平; 最后,提出了针对深层因素的具体风险控制措施,为预制建筑的发展提供了新的思路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号