...
首页> 外文期刊>Inside the Air Force >Air Force aims for B-52 CERP down-select in September
【24h】

Air Force aims for B-52 CERP down-select in September

机译:空军目的是9月份B-52 CERP

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Air Force is progressing toward a down-select decision for the B-52 Commercial Engine Replacement Program, with plans to award a contract in September following a technical risk assessment and cost estimate review this summer. The program's current strategy is to take advantage of Middle Tier Acquisition authorities to conduct two phases of prototyping. In the first phase, which is ongoing, the service is working with Pratt & Whitney, General Atomics and Rolls Royce to develop virtual prototypes of their engine offerings. During the second phase, the program would develop a physical prototype. Under that strategy, the program would either shift to a traditional acquisition pathway or to a rapid-fielding MTA following completion of the prototype, likely in the fiscal year 2025 timeframe. However, acting service acquisition executive Darlene Costello told lawmakers this week this summer's reviews could lead the service to transition earlier than expected to the traditional pathway.
机译:空军正在向B-52商业发动机更换计划进行下班决定,计划在今年夏天的技术风险评估和成本估算审查之后颁发九月奖励合同。 该计划目前的策略是利用中层收购机构进行两次原型阶段。 在正在进行的第一阶段,该服务正在使用Pratt&Whitney,一般原子,并滚动罗伊斯来开发其发动机产品的虚拟原型。 在第二阶段,该计划将开发物理原型。 在该策略下,该计划将转移到传统的收购途径或在完成原型之后的快速场合MTA,可能在2025财年的时间范围内。 然而,这一夏天审查的达琳·科斯特洛曾告诉立法者,这次夏季的审查可能会提前过渡到传统途径的转型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号