...
首页> 外文期刊>Engineering >Dye Test within Mosul Dam Area
【24h】

Dye Test within Mosul Dam Area

机译:MOSUL坝区染料试验

获取原文

摘要

Mosul Dam is located on the River Tigris about 60 km north of Mosul city in Iraq. The dam is a multipurpose earth fill dam with a storage capacity of 11.11 million cubic meters, which was in operation since 1986. During the first impounding of its reservoir, seepage of water underneath the foundation of dam was noticed due to the desolation of gypsum beds. This raised concern about the stability of the dam and since then grouting operation were carried out. ISIS occupied the dam 8 - 16 August 2014. Grouting operations stopped and number of equipment and buildings were destroyed during that short period. After the defeat of ISIS, the Iraqi Ministry of Water Resources rebuilt and constructed the destroyed parts within the site and a new maintenance operations program was adopted. New training courses for the staff of Mosul Dam were conducted with Trevi Company and US Army Corps of Engineers. In this paper, the dye test is highlighted to monitor the seepage of groundwater within the dam site. It seems that the dam is stable in its present conditions and water level height.
机译:Mosul Dam位于伊拉克Mosul City以北约60公里的Tigris。大坝是一种多功能地球填充水坝,存储容量为11110万立方米,自1986年以来正在运行。在其水库的第一次蓄积期间,由于石膏床的沉淀,发现了大坝的基础下面的水渗流。这提出了对大坝的稳定性的担忧,因为然后进行灌浆操作。 Isis占据了大坝 - 2014年8月16日。在短时间内,灌浆业务停止,设备和建筑物数量被摧毁。在ISIS失败之后,伊拉克水资源部重建并建造了该网站内的被破坏的部分,并采用了新的维护运营计划。 Mosul Dam员工的新培训课程由Trevi公司和美国陆军工程师进行。本文突出了染料试验,以监测坝址内地下水的渗流。似乎大坝在目前的条件和水位高度稳定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号