首页> 外文期刊>Advances in civil engineering >Migration Characteristics of Boring Mud in Roadway Floor Anchor Wire Hole and Test in Coal Mine
【24h】

Migration Characteristics of Boring Mud in Roadway Floor Anchor Wire Hole and Test in Coal Mine

机译:巷道地板锚丝孔钻孔泥浆迁移特性及煤矿试验

获取原文
           

摘要

Given the difficulty in drilling the anchor holes in the roadway floor of the coal mine, the characteristics of slag movement in the process of positive and negative circulation drilling are analyzed. It is concluded that the interaction between the three zones of drilling and slag is the fundamental reason restricting the rapid drilling of the anchor cable hole in the floor, and it is proposed that the pump reverse circulation drilling can effectively prevent the formation of the three zones of drilling and slag. According to the actual situation, the relationship between drilling depth, vacuum degree of the pump, and the velocity of drilling fluid and the volume of drilling slag is obtained. The results show that the pump suction reverse circulation is feasible for the rapid drilling of the anchor hole of the floor. A set of pump suction reverse circulation drilling systems has been developed, and floor anchor wire hole drilling and slag discharge operation at the same time were realized. The field test shows that the effective drilling time of the anchor cable hole in the depth of 5.6?m can be controlled within 30?min, which solves the problem of deep hole drilling in the anchor hole of the bottom plate and purifies the working environment.
机译:鉴于钻井煤矿道路地板中的锚孔难以分析正面循环钻井过程中的炉渣运动的特性。结论是,三个地区的钻孔和渣之间的相互作用是限制地板上锚缆线孔的快速钻孔的基本原因,提出了泵反向循环钻孔可以有效地防止三个区域的形成钻井和渣。根据实际情况,获得钻孔深度,泵真空度与钻井液的速度和钻井渣的速度之间的关系。结果表明,泵抽吸反向循环对于地板锚孔的快速钻孔是可行的。已经开发了一组泵抽吸反向循环钻井系统,并且实现了地板锚定线钻孔和炉渣放电操作。现场测试表明,锚缆线的有效钻孔时间在5.6Ωm的深度中可以控制在30?min内,这解决了底板的锚孔中深孔钻孔的问题,并净化了工作环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号