Numerical Investigation on Time-Dependent Deformation in Roadway

机译:巷道时代依赖变形的数值研究

获取原文

摘要

The roadway deformation normally relates to time especially for underground coal roadway. The strength of soft coal is low, and therefore the deformation increases gradually under constant stress with time, which is called rheology deformation. In this study, based on a field case, the rock mass properties and deformation data of the roadway were obtained according to the field test. A 3D numerical model was then established, and the rheological deformation including horizontal and vertical deformation of the coal roadway was systematically analyzed. The results showed that the rheological deformation of horizontal sidewall accounts for almost 30% of the whole deformation, and the stable time for such roadway is around 60 days after excavation. The tendency of the roof deformation is similar to the sidewalls, and however, the floor deformation is different. Then the related suggestions for maintaining the stability of such roadway were proposed, which is useful in-field application.
机译:道路变形通常涉及特别适用于地下煤道路的时间。 软煤的强度低,因此变形在恒定胁迫下逐渐增加,随着时间的推移,称为流变变形。 在本研究中,基于现场情况,根据现场测试获得道路的岩石质量和变形数据。 然后建立了3D数值模型,系统地分析了包括水平和垂直变形的流变变形。 结果表明,水平侧壁的流变变形占整个变形的近30%,并且这种道路的稳定时间是挖掘后60天。 屋顶变形的趋势与侧壁类似,然而,地板变形是不同的。 然后提出了保持这种道路稳定性的相关建议,这是有用的现场应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号