首页> 外文期刊>Journal of Threatened Taxa >On the inadequacy of environment impact assessments for projects in Bhagwan Mahavir Wildlife Sanctuary and National Park of Goa, India: a peer review
【24h】

On the inadequacy of environment impact assessments for projects in Bhagwan Mahavir Wildlife Sanctuary and National Park of Goa, India: a peer review

机译:关于Bhagwan Mahavir野生动物保护区和果阿国家公园环境影响评估的不足:同行评审

获取原文
           

摘要

The Environment Impact Assessment (EIA) is a regulatory framework adopted since 1994 in India to evaluate the impact and mitigation measures of projects, however, even after 25 years of adoption, EIAs continue to be of inferior quality with respect to biodiversity documentation and assessment of impacts and their mitigation measures. This questions the credibility of the exercise, as deficient EIAs are habitually used as a basis for project clearances in ecologically sensitive and irreplaceable regions. The authors reiterate this point by analysing impact assessment documents for three projects: the doubling of the National Highway-4A, doubling of the railway-line from Castlerock to Kulem, and laying of a 400-kV transmission line through the Bhagwan Mahavir Wildlife Sanctuary and National Park in the state of Goa. Two of these projects were recently granted ‘Wildlife Clearance’ during a virtual meeting of the Standing Committee of the National Board of Wildlife (NBWL) without a thorough assessment of the project impacts. Assessment reports for the road and railway expansion were found to be deficient on multiple fronts regarding biodiversity assessment and projected impacts, whereas no impact assessment report was available in the public domain for the 400-kV transmission line project. This paper highlights the biodiversity significance of this protected area complex in the Western Ghats, and highlights the lacunae in biodiversity documentation and inadequacy of mitigation measures in assessment documents for all three diversion projects. The EIA process needs to improve substantially if India is to protect its natural resources and adhere to environmental protection policies and regulations nationally and globally. Author Biography Wildlife Conservation Trust, 11 th Floor, Mafatlal Centre, Nariman Point, Mumbai - 400021, Maharashtra, India.
机译:环境影响评估(EIA)是一项自1994年以来通过的监管框架,以评估项目的影响和缓解措施,然而,即使在25年的收养后,EIA也在继续对生物多样性文件和评估具有劣等的质量影响及其缓解措施。这项问题的可信度是缺乏欧洲偶数的可信度习惯性地被用作生态敏感和不可替代地区的项目间隙的基础。作者通过分析了三个项目的影响评估文件来重申这一点:国家高速公路-4a的加倍,从Castlock到Kulem的铁路线加倍,并通过Bhagwan Mahavir野生动物保护区和铺设了400 kV输电线路果阿州国家公园。这些项目中的两个是在国民野生动物委员会常务委员会(NBWL)的虚拟会议期间批准了“野生动物清除”,而不彻底评估项目影响。在有关生物多样性评估和预计影响的多个方面,发现道路和铁路扩张的评估报告有缺陷,而400 kV输电线路项目的公共领域没有使用影响评估报告。本文突出了西部止步区的这种受保护区综合体的生物多样性意义,并突出了所有三个转移项目评估文件中的生物多样性文件中的空白和缓解措施的不足。如果印度保护其自然资源,并坚持全国和全球,所以如果印度保护其自然资源并坚持环境保护政策和法规,则需要大幅改善。作者传记野生动物保护信托,11楼,Mafatlal中心,Nariman Point,Mumbai - 400021,印度马哈拉施特拉。
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号