...
首页> 外文期刊>Transportation Research Procedia >Establishing Line Throughput with Regard to the Operation of Longer Trains
【24h】

Establishing Line Throughput with Regard to the Operation of Longer Trains

机译:在更长的列车的运作方面建立线路吞吐量

获取原文
   

获取外文期刊封面封底 >>

       

摘要

The paper deals with the issue of capacity of railway infrastructure in connection with the operation of freight trains with a length of up to 740 m. First, the facts in the field of the arrangement of railway infrastructure elements that may have a potential impact on capacity will be listed. Subsequently, there will be proposed indicators that can be used for detection of possible changes in capacity, due to the operation of trains with a length of 740 m. In the last phase, several simulation scenarios will be realized in the OpenTrack program. In these scenarios 740 m long trains will be deployed on the selected routes of the model timetable. The simulation results will eventually be evaluated using previously proposed indicators.
机译:本文涉及铁路基础设施能力问题,与货运训练的运作有关,长度高达740米。首先,列出了可能对容量产生潜在影响的铁路基础设施元素的布置领域的事实。随后,由于具有长度为740米的火车的操作,将有提出的指标用于检测能力的可能变化。在最后一个阶段,在Opentrack程序中将实现几种仿真方案。在这些方案中,740米将在模型时间表的所选路由上部署长达列车。仿真结果最终将使用先前提出的指标进行评估。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号