首页> 外文期刊>Revista de la construccion >Delay causes in road infrastructure projects in developing countries
【24h】

Delay causes in road infrastructure projects in developing countries

机译:发展中国家道路基础设施项目延误原因

获取原文
           

摘要

Project delays adversely affect road infrastructure development in developing countries. Unfavorable consequences of project delays involve cost overrun, contractual disputes, arbitration, and quality non-conformities. Despite these risks, literature shows that delays are still a prevalent problem in construction management. Although there is a considerable number of publications on project delays, few studies have compared their causes between developing countries. Therefore, this study aimed to: a) classify and determine the level of influence of the delay causes;b) find the relationship between delay causes and country's development;and c) propose recommendations for mitigating the most critical causes in developing countries. A systematic literature review provided a sample of 14 primary studies from Africa (50%) and Asia (50%). Based on this sample, the study found that developing countries, with a GDP per capita ($US2018) <= $ 2,000, may experience different delay causes depending on the economic and the geographical contexts. In African countries with a Global Competitiveness Index -GCI <= 56, road projects may experience delays due to financial issues of the project owner, as well as delays due to equipment/material issues of the project supplier/subcontractor. On the other hand, in Asian countries with a GCI between 62 and 49, road projects may experience delays due to financial issues of the project contractor, and delays due to planning issues of the project designer/consultant. According to these economic contexts, this study proposes a frame of causes and mitigation actions as a contribution to the risk analysis of road projects in developing countries.
机译:项目延误对发展中国家的道路基础设施发展产生了不利影响。项目延误的不利后果涉及成本超支,合同争议,仲裁和质量不合格。尽管有这些风险,但文献表明,延迟仍然是施工管理中的普遍存在问题。虽然项目延误存在相当数量的出版物,但很少有研究比较了发展中国家的原因。因此,本研究旨在:a)分类和确定延迟原因的影响程度; b)找到延误原因与国家发展之间的关系;以及c)提出了减轻发展中国家最关键的原因的建议。系统文献综述提供了14项非洲初级研究的样本(50%)和亚洲(50%)。基于该样品,该研究发现,随着人均GDP(US2018)<= 2,000美元的发展中国家可能会遇到不同的延迟原因,具体取决于经济和地理环境。在全球竞争力指数的非洲国家 - GCI <= 56,道路项目可能由于项目所有者的财务问题而遭受延误,以及由于项目供应商/分包商的设备/物质问题,延迟。另一方面,在62至49期的GCI之间的亚洲国家,道路项目可能由于项目承包商的财务问题而遭遇延误,并且由于项目设计师/顾问的规划问题而延误。根据这些经济背景,本研究提出了一种对发展中国家道路项目风险分析的贡献框架。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号