...
首页> 外文期刊>International Journal of Sustainable Construction Engineering and Technology >Factors Affecting the Client's Performance in the Public Construction Projects: Case Study of Oman
【24h】

Factors Affecting the Client's Performance in the Public Construction Projects: Case Study of Oman

机译:影响客户在公共建设项目中表现的因素:阿曼案例研究

获取原文
           

摘要

Despite the vast research on construction projects management issues in the Middle-East, little is known about client involvement in public projects. This article presents a study on identifying significant factors affecting client participation performance in public construction projects in the Sultanate of Oman. The study was conducted in quantitative approach where the data was collected through questionnaire survey. The collected data was analysed statistically to determine the ranking of the identifiedfactors based on the degree of involvement in the project. The study found that the handover phase had the highest client’s participation, while the operations and maintenance phase had the lowest client’s participation among all the five construction phases. The low client participation in any project has an undesirable influence on the projects’ overall outcomes. Consequently, this condition has harmed the time of completion of construction projects in the Sultanate of Oman. This condition is also the main reason for the quality problems in construction projects in Oman.
机译:尽管中东地区建设项目管理问题存在巨大的建设项目,但对客户参与公共项目的知识毫无疑问。本文介绍了识别阿曼苏丹苏丹苏丹国公共建设项目中的客户参与绩效的重要因素的研究。该研究是以定量方法进行的,其中通过调查问卷调查收集数据。在统计上分析收集的数据以根据项目的参与程度确定确定的要素的排名。该研究发现,切换阶段具有最高的客户的参与,而运营和维护阶段则在所有五个施工阶段之间的客户参与最低。低客户参与任何项目对项目的整体结果有不良影响。因此,这种情况损害了阿曼苏丹酸盐的建设项目的时间。这种情况也是阿曼建设项目质量问题的主要原因。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号