External Factors of Delay That Affect the Performance of International Construction Contractors in Kuwait

机译:影响科威特国际建筑承包商表现的外部因素

获取原文
       

摘要

As the construction industry in Kuwait develops, the need for international contractors to handle and manage these projects rises as well. Currently, 70% of the projects in Kuwait get delayed, some by internal factors, and other by external ones. Typically, researchers focus on the internal delays and emphasize international contractors to enhance their understanding and implications of the required preventive and corrective actions. However, external factors of delay are a newly generated type of delays that represent all the delays that are beyond the contractor’s control and cannot be anticipated in the project. Thus, the purpose of this research is to provide a framework for international construction contractors in Kuwait regarding the external factors of delay that they might face in their projects. In this research, a qualitative research methodology is applied by extracting and discussing the most important and frequently occurring external factors of delay with 15 project management professionals to elaborate their perspectives and construct a survey to evaluate the impact and frequency of these delaying factors in the construction industry in Kuwait. This survey was distributed to 80 project management practitioners; then, the outcomes were analyzed by using the Relative Importance Index methodology to rank the effect of the examined delaying factors. The results if this research has highlighted the significance of lack of project management proficiency, unreliable subcontractors & conflict between contractor and other contracting parties. Hence this research will provide international construction contractors with an illustration of the delaying factors that they should focus on and the ones they can pay less attention to them.
机译:随着科威特建筑业的发展,需要国际承包商处理和管理这些项目的上涨。目前,70%的科威特项目延迟,部分因素,以及外部因素。通常,研究人员专注于内部延误,并强调国际承包商,以加强他们对所需预防和纠正措施的理解和影响。然而,延迟的外部因素是一种新生成的延迟类型,代表了承包商控制之外的所有延误,不能在项目中预期。因此,本研究的目的是为科威特提供国际建筑承包商的框架,了解他们可能面临其项目的外部因素。在这项研究中,通过提取和讨论最重要的和讨论延迟的最重要和经常发生的外部因素,利用15个项目管理专业人员来拟订他们的观点,构建调查以评估这些延迟因素在建设中的影响和频率的调查科威特的行业。本调查分发给80个项目管理从业者;然后,通过使用相对重要性指数方法来分析结果,以对所检查的延迟因子进行排名。结果突出了缺乏项目管理能力,不可靠的分包商和承包商和其他缔约方冲突的重要性。因此,该研究将提供国际建筑承包商,其中包含他们应该专注于的延迟因素,以及他们可以不关注它们的人。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号