Estimation of Labour Damage for Disruption and Prolongation Claims Using Measured Miles Analysis

机译:测量的里程分析估算破坏和延长索赔的劳动损伤

获取原文
       

摘要

Accurate quantification of lost productivity on contractors due to disruption by the Client is one of the major headache in the field of claim analysis. Estimation of lost productivity is one of the contentious task under claim management and very challenging to attain accurate loss in productivity. There are a number of methods provided for estimation of damages caused by lost productivity, but among them Measured Miles method is known for its accuracy and preferred by courts and boards. Measured Mile method works by comparing actual productivities obtained during two different sessions at which the company was exercising its full capacity and those times where the progress of the work was impaired by the Employer. In order to show the procedure employed to conduct a Measured Miles approach to quantify a disruption and prolongation damages a case study a claim occurred at Great Ethiopian Renaissance Dam Project is carried out. Finally, the study shows how much Measured Miles approach is helpful for equitable decision-making and helped the Employer to protect himself from unnecessary expense caused by biased decision.
机译:由于客户破坏,准确量化承包商的损失损失是索赔分析领域的主要头痛之一。估计损失的生产率是主张管理的争议任务之一,并且非常具有挑战性,以实现高准确的生产力损失。提供了许多方法,用于估计由于生产率损失而导致的损坏,但其中测量的里程法以其准确性而闻名,由法院和董事会首选。测量的英里方法通过比较两种不同的会话期间获得的实际生产性,并在该公司行使其全部容量和工作进度受到雇主的进步的情况下获得的实际产品。为了展示用于进行测量的里程方法来量化中断和延长损害的程序,案例研究在伟大的埃塞俄比亚文艺复兴坝项目中发生了索赔。最后,该研究表明了测量的里程方法有助于公平决策,并帮助雇主保护自己免受偏见决定造成的不必要的费用。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号