Redefinition of Cost-Benefit Efficiency of Land-Use Projects: Focusing on Environmental Cost

机译:重新定义土地利用项目的成本效益:专注于环境成本

获取原文

摘要

The cost-benefit efficiency of projects is often wrongly evaluated due to the neglect of projects’ impact on the environment. In this paper, we aim to establish a model to measure such an impact and hence propose a more reasonable approach to evaluating cost-benefit efficiency of projects. We divide the total cost of a certain project into two parts: Business Cost (BC) and Environmental Cost (EC). BC is the explicit cost that can be approached from financial statements, while EC is the implicit cost which we try to quantify. EC is composed of three parts: (1) the Ecosystem Service Value (ESV), (2) the Restoration Cost (RC) to treat the pollution caused by the projects, and (3) the Disaster Cost (DC), potential losses caused by disasters due to launch of new projects. In order to make a cost-benefit efficiency analysis, we introduce profitability index, which is further developed into an adjusted profitability index by taking time value into consideration. Two case studies are conducted to evaluate the effectiveness of the model. A regional case of a coal-mining project proves that RC and DC play a significant role in cost-benefit efficiency analysis, while a nationwide case of high-speed rail shows that project scale matters. Additionally, we put our attention on the intensity of the project, which is a created measurement to characterize the project. Based on the study of intensity, the mechanism of cost-benefit break-even is further explained and some suggestions are proposed to policy makers.
机译:由于项目对环境的影响忽视,项目的成本效益效率通常被错误地评估。在本文中,我们的目标是建立一种衡量这种影响的模型,从而提出了一种更合理的方法来评估项目的成本效益。我们将某个项目的总成本分为两部分:商业成本(BC)和环境成本(EC)。 BC是可以从财务报表接近的明确成本,而EC是我们尝试量化的隐含成本。 EC由三部分组成:(1)生态系统服务价值(ESV),(2)恢复成本(RC)处理项目造成的污染,(3)灾难成本(DC),潜在损失造成的损失因推出新项目而因灾害而受到灾难。为了进行成本效益效率分析,我们引入盈利性指数,通过考虑时间值,进一步发展成为调整后的盈利能力指数。进行两种案例研究以评估模型的有效性。煤矿项目的区域案例证明,RC和DC在成本效益效率分析中发挥着重要作用,而高速铁路的全国性案例表明项目规模的重要事项。此外,我们引起了项目的强度,这是一个创建的项目,以表征项目。基于对强度的研究,进一步解释了成本效益突破的机制,提出了一些建议对决策者。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号