首页> 外文期刊>MATEC Web of Conferences >The railway superstructure monitoring in bratislava tunnel no. 1 – section of ballastless track and its transition areas
【24h】

The railway superstructure monitoring in bratislava tunnel no. 1 – section of ballastless track and its transition areas

机译:布拉迪斯拉发隧道中铁路上部结构监测。 1 - 无碴轨道及其过渡区域

获取原文
           

摘要

The requirements for the quality of the railway track with emphasis on its long service life, low maintenance costs and the required parameters of the track geometry have led railway infrastructure manager on the territory of the Slovak Republic – Zeleznice Slovenskej republiky (ZSR) – to modernize or to realize reconstructions of railway lines on the appropriate track sections with the application of the unconventional construction of the railway superstructure (ballastless track). The Department of Railway Engineering and Track Management currently performs the monitoring of two sections with the application of ballastless track construction. This paper is aimed to the monitoring of the ballastless track section and presents the results obtained so far in one of the monitored sections in the Bratislava tunnel No. 1.
机译:铁路轨道质量的要求强调其长期使用寿命,低维护成本和轨道几何所需参数在斯洛伐克共和国领土上LED铁路基础设施经理 - Zeleznice Slovenskej Republiky(ZSR) - 现代化或者在适当的轨道部分上实现铁路线的重建,应用铁路上层建筑的非常规结构(禁止轨道)。铁路工程和轨道管理部目前在应用禁止轨道施工时执行两个部分的监测。本文旨在监测禁止轨道部分,并在布拉索拉夫隧道1号的监测部分中展示了迄今为止所获得的结果。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号