首页> 外文期刊>E3S Web of Conferences >Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
【24h】

Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space

机译:淹水台液压矿井参数对坑剩余空间污泥池形成影响的调查

获取原文
       

摘要

The research aim is establishment of effective parameters for mining of flooded bench by a hydro-mechanized complex with dumping of enclosing rocks in a sludge pond of pit residual space. The established research results make it possible to choose the effective width of the dredger mining cut at the hydromechanical method, taking into account the volume of the excavation and dump pipeline movements. Two technological schemes for the formation of a sludge pond in the pit residual space are proposed, they differ in the direction of the sludge pond movement relatively to the pit front. The established dependence of the number of movements of the sludge pond pipeline on the width of the dump pass allows to choose its effective value, taking into account the number of discharge pipes. Based on the dependence of the average monthly excavation volume and the number of movements of sludge pond pipeline on the width of cut face, the optimal number of discharge pipes is established. The research results allow establishing the effective dredger width of the sludge pond and the number of discharge pipes provided that a transverse or longitudinal pass at the internal sludge pond formation is applied during the mining.
机译:该研究目的是通过水力机械化综合体建立淹水长凳采矿的有效参数,倾倒在坑残余空间的污泥池中的封闭岩石。建立的研究结果使得可以在流体机械方法中选择挖泥机挖掘的有效宽度,考虑到挖掘和倾倒管道运动的体积。提出了两种用于在坑残余空间中形成污泥池的技术方案,它们在污泥池运动的方向上与坑前面相对不同。考虑到排出管数量,污泥池管道运动次数对倾倒通道宽度的既定依赖性允许选择其有效值。基于平均月挖掘体积的依赖性和污泥池管在切割宽度宽度的污泥池管的移动次数,建立了放电管的最佳数量。研究结果允许建立污泥池的有效挖泥船宽度和排出管的数量,条件是在采矿过程中施加内部污泥池塘形成的横向或纵向通道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号