...
首页> 外文期刊>E3S Web of Conferences >Tidal River Management (TRM) and Tidal Basin Management (TBM): A case study on Bangladesh
【24h】

Tidal River Management (TRM) and Tidal Basin Management (TBM): A case study on Bangladesh

机译:潮汐河管理(TRM)和潮汐盆地管理(TBM):孟加拉国案例研究

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Bangladesh is the biggest delta of the world. Construction of numbers of polders is one of the flood resilient approach. But the presence of coastal polders de-linked the flood plain. The siltation in river causes riverbeds to become higher than the adjacent crop lands, and vast area under the polders became permanently water logged rendering large tract of land uncultivable. The current practice is temporarily de-poldering by cutting embankment. This is a natural water management process with very little human interventions but it needs strong participation and consensus with a great deal of sacrifice by the stakeholders for a specific period (3 to 5 years or even more)[1]. An attempt has been made to study the phenomena of tidal basin management reviewing some secondary data and processes involved in successfully operated tidal basins of Bangladesh. And preliminary laboratory experiments are carried out to precisely look into the suspended sediment transport. With varying outflow discharge and sediment supply, the transport processes are investigated. 3D sediment transport model developed using openFOAM has good agreement with experimental result and can be used to better understand effectiveness of tidal basin management.
机译:孟加拉国是世界上最大的三角洲。圩田数量的建设是洪水弹性方法之一。但是沿海圩田的存在解除了洪泛平原。河流的淤积会导致河床高于相邻的作物土地,圩区下的广阔面积越来越永久地呈现出越来越大的土地的缺陷。目前的做法通过切割路堤暂时脱模。这是一种自然水管理过程,人类干预较少,但它需要强有力的参与和共识,利益攸关方对特定时期(3至5年甚至更多)[1]。已经尝试研究潮汐盆地管理现象,审查孟加拉国成功运营的潮汐盆地中涉及的一些二级数据和流程。并进行初步实验室实验,以精确地调查悬浮的沉积物运输。随着各种流出放电和沉积物供应,调查运输过程。使用OpenFoam开发的3D沉积物传输模型与实验结果吻合良好,可用于更好地了解潮汐盆地管理的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号