首页> 外文期刊>Natural Hazards and Earth System Sciences Discussions >The Capacity Building programmes of GITEWS – visions, goals, lessons learned, and re-iterated needs and demands
【24h】

The Capacity Building programmes of GITEWS – visions, goals, lessons learned, and re-iterated needs and demands

机译:Gitews的能力建设方案 - 愿景,目标,经验教训以及重新迭代的需求和需求

获取原文
获取外文期刊封面目录资料

摘要

It was envisioned that the framework of the German-Indonesian Tsunami Early Warning System (GITEWS) should achieve an integral architecture and overarching technical design of an end-to-end tsunami early warning system (TEWS). In order to achieve this ambitious goal on a national and local level, a tailored set of capacity building measures has been started and implemented. The programme was meant and designed to meet requirements and urgent needs considering awareness raising campaigns, technical trainings and higher level education programs. These components have been integrated as complementary modules in order to ensure facilitating the early warning system to be operated, maintained and improved, and that institutions and people in coastal areas will respond adequately and timely in case of future tsunamis. Remarkable progress has been accomplished as well as programs and campaigns are being implemented in regard to a sustainable capacity development conducted by national institutions in Indonesia. Yet, local administrative and preparedness efforts on the Indonesian coastlines are still underdeveloped. This stems from the fact of missing links towards sustainable coastal zone management schemes on a broad local level. Yet, the demand and urgent need for an adequate and integrated disaster risk reduction and management addressing also other hazards in the region of interest is (still) substantial. Given the tragic loss of life and severe damages resulting from the December 2004 tsunami and recent series of severe earthquakes, the need for urgent mitigating action in the imperilled coastal regions of Sumatra and Java remains extremely high. The conceptual Capacity Building framework, its anticipated goals in the beginning of the project and, lately, the finally achieved objectives are promising. A significant contribution for mainstreaming scientific approaches and transfer methodological disaster risk reduction attempts towards other regions exposed to coastal hazards is still pending. Local authorities and researchers in tentative affected regions are now trained and enabled to disseminate and apply their knowledge and planning experience to other coastal regions in the area to help facilitating and multiplying effective disaster management plans and strategies. Yet, the Capacity Building framework within GITEWS also elucidated gaps in the early warning chain so that updated and to some extent re-iterated needs and demands in Capacity Building programs in any future research or development cooperation project are presented and discussed.
机译:预计德国印度尼西亚海啸预警系统(Gitews)的框架应达到一体的架构和总体技术设计的端到端海啸预警系统(TEWS)。为了实现国家和地方一级的雄心勃勃的目标,已经开始并实施了一系列量身定制的能力建设措施。该计划旨在旨在满足要求和迫切需求,考虑提高培养活动,技术培训和更高水平的教育计划。这些组件已被整合为互补模块,以确保促进要运营,维持和改进的预警系统,以及沿海地区的机构和人员将在未来海啸的情况下充分响应。已经取得了显着进展以及在印度尼西亚国家机构进行的可持续发展能力发展方面正在实施方案和运动。然而,印度尼西亚海岸线上的当地行政和准备工作仍未开发。这源于缺少沿海地区管理计划的缺失联系,在广泛的地方一级。然而,对充分和综合的灾害风险减少和管理解决的需求和迫切需要在感兴趣区域(仍然)的其他危害是重大的。鉴于2004年12月海啸和最近系列严重地震所产生的悲惨损失和严重损害造成的严重损失,在苏门答腊和Java的危险沿海地区的危急缓解行动的必要性仍然非常高。概念性能力建设框架,其预期的项目在项目开始,最近,最终实现的目标是有前途的。将科学方法和转移方法论灾害风险降低的重大贡献对暴露于沿海危害暴露的其他地区的尝试仍在等待中。目前受影响地区的地方当局和研究人员现已接受培训并启用,以传播和应用他们的知识和规划经验,以帮助促进和乘以有效的灾害管理计划和战略。然而,Gitews内的能力建设框架也阐明了预警链中的差距,以便在提供和讨论任何未来的研究或开发合作项目中的能力建设方案的重新迭代需求和需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号