Multi-objective topological reconfiguration of a Low Voltage electrical distribution network by optimal repositioning of MV / LV multi-transformers using Elitist Algorithms of the NSGA-II type

机译:利用NSGA-II型的ELITIST算法,通过最佳重新定位MV / LV多变压器的低压电气分配网络的多目标拓扑重新配置

获取原文
           

摘要

Several transformers in the Low-Voltage (LV) distribution networks of Benin Electric Company are off-center from theloads’sgravity connected to them. This situation is due to the continuous growth of loads on these networks and the extension of LV lines. This paper presents an approach based on the elitist NSGA-II genetic algorithmfor optimalrelocation of MV/LV multi-transformers in a quasi-sinister distribution network. The results obtained show that the power losses which were 72.6 kW in the basic configuration are reduced for the case of single-transformer positioning by 51.07% and by 91.80% for the multi-transformer positioning of two 400kVA units. The evaluation of the profitability of the two options revealed that the optimal positioning of 400 kVA multitransformers in the Zogbadjè network is economically and technically viable compared to the first option of positioning an 800kVA transformer at node 8.This study also showed that the Return On Investment (ROI) is 5 month 15 days with a Net Present Value (NPV) equal to 315,770,000 CFA . This project of optimal relocation of distribution transformers is highly relevant and effective in reducing losses and operating costs of distribution networks.
机译:贝宁电气公司低压(LV)配电网络中的几种变压器从连接到它们的罗纳斯格的偏远中心。这种情况是由于这些网络上的负载的持续增长和LV线的延伸。本文介绍了一种基于Elitist NSGA-II遗传算法的方法,对于准脉冲分配网络中MV / LV多变压器的最佳分配最佳分配。得到的结果表明,在单变压器定位的情况下,为基本配置中的72.6 kW的功率损耗降低了51.07%,对于两种400kVA单位的多变压器定位,为51.07%和91.80%。评估两种选择的盈利能力揭示了Zogbadjè网络中的400 kVA多体内变化器的最佳定位在经济上和技术上是可行的,与节点8.本研究也显示投资回报率(ROI)是5个月15天,净目前值(N​​PV)等于315,770,000 CFA。该项目的最佳分配变压器搬迁项目具有高度相关性,有效地降低了分销网络的损失和运营成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号