Improvement of Bulk Power Supply to Ada-George Axis of Port Harcourt: A Case Study of Port-Harcourt Town/Rumuosi 132/33kV Sub-Transmission Station 33KV Feeders Feeding the Axis

机译:港口港乔治轴的散装电力供应改进 - 以轴饲喂轴的港口镇/拉姆索尼132 / 33KV子传输站33kV馈线

获取原文
       

摘要

Power Supply to Ada-George axis of Port Harcourt has been unreliable and posing danger to thepopulace within the axis. Some area of the Ada- George axis is fed from the 132/33kV Port-Harcourt Town(Zone 4), mainly on Rumuolumeni feeder and UST feeder; and the 132/33kV Rumuosi sub-transmissionsubstation in Obio-Akpor Local Government area of River State. This research is targeted to proffer solution tothe area under consideration by providing bulk power supply. The application of network reconfiguration,reactive power compensation (Capacitor Bank) at strategic locations were able to enhanced the voltage profile.The networks were modeled using ETAP software from base-case to improved-case. Due to the system networksand fast convergence requirement Newton-Raphson load flow technique was used in the simulation. The variousdata collected are presented within. The base- case simulation results for Rumuolumeni feeder, UST feeder, andRumuosi33kV feeders showed that they all experienced under voltages, inadequate power supply and someoverloaded transformers. The voltage profile for Rumuolumeni, UST and Rumuosi 33KV feeders were obtainedfrom the simulation of the(base-case) with ETAP software. The obtained results for Rumuolumeni (93.2%), UST(92.84%) and Rumuosi (89.7%) of the nominal bus voltage of 33kV falls short of the acceptable limit of (33kV ±5%). Net power received (supplied load) by the three feeders in the base-case shows that only 72%-75% of theconnected loads received power. After rigorous reconfiguration and applying network optimization techniques,the Rumuolumeni and UST feeders were integrated into 132/33kV Rumuosi sub-transmission substation torelieve the 132/33kV Port-Harcourt Town sub-transmission substation (Zone4) from excessive loads connected.The Ada-George axis of western Port-Harcourt is fully revamped having upgraded the Rumuosi TS to 3x 60MVA, 132/33kV transformers; The result for the simulation of the improved- cases showed that the voltageprofile for New Rumuolumeni, New UST and Rumuosi 33kV feeders improved to 99.15%, 98.82% and 98.02%ofthe nominal voltage respectively. These results fall within the acceptable limit of 95%-105% of the nominalvoltage. The net power received by the New Rumuolumeni, New UST and Rumuosi 33kV feeders have beenimproved to 98.24%, 94.78% and 97.96% of the connected loads in MVA respectively. Three numbers of 30-36MVar capacitor banks were added into the feeders’ networks to compensate for reactive power loss. A new132/33kV Rumuolumeni sub-transmission substation is proposed, taking a tee-off from the Omoku TS lines atEmohua for future expansion to the neighboring communities.
机译:对港口港口的ADA-George轴的电源不可靠,并且对轴内的润穴造成危险。 ADA-乔治轴的一些区域是由132 / 33kV港口柱镇(4区)喂养,主要是在Rumuolumeni饲养者和UST喂食器上;河流河州Obio-Akpor地方政府地区的132 / 33kV Rumuosi分透析。该研究是针对通过提供散装电源考虑的解决方案的解决方案。在战略位置处的网络重新配置,无功补偿(电容器组)能够增强电压曲线。网络使用ETAP软件从基本情况到改进的情况进行建模。由于系统网络和快速收敛要求,在模拟中使用了牛顿-Raphson负载流技术。收集的各种各样的数据都在内。 Rumuolumeni馈线,UST馈线,Andrumuosi33kV馈线的基本情况仿真结果表明,它们都在电压下进行,供电不足和变压器。 Rumuolumeni,UST和Rumuosi 33kV进纸器的电压曲线是用ETAP软件的模拟(基本情况)的模拟。对于33kV的标称母线电压的Rumuolumeni(93.2%),UST(92.84%)和Rumuosi(89.7%)的所得结果缺少(33kV±5%)的可接受限度。基本情况下的三个馈线接收(提供负载)的净功率显示,只有72%-75%的连接负载接收功率。经过严格的重新配置和应用网络优化技术,将Rumuolumeni和UST进料器集成到132 / 33kV Rumuosi子变速器中,从连接的过度负载到过多负载,卷取132 / 33kV端口柱镇子传输变电站。Ada-George西部港口的轴线完全改造,升级了Rumuosi TS至3X 60MVA,132 / 33kV变压器;改进案例的模拟结果表明,新的Rumuolumeni,新型UST和Rumuosi 33kV饲养者的压缩性分别提高了标称电压的99.15%,98.82%和98.02%。这些结果落在了最终的可接受的限度范围内为95%-105%。新的Rumuolumeni,新型UST和Rumuosi 33kV饲养者接收的净功率分别已被呈现为MVA中连接载荷的98.24%,94.78%和97.96%。将三个数量的30-36mvar电容器组添加到进料器的网络中以补偿无功功率损耗。提出了一种新的132 / 33kV Rumuolumeni子传输变电站,从Omoku TS线Atemohua进行了一个Tee-Off,以便将来扩张到邻近社区。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号