Dams are essential elements in any modern society and have great economic values. However,they present potential catastrophic risk of failure which is mostly attributed to seepage. To control seepage,effect of dam cut-off wall at mid sections of the dam having STA 455 was analysed using the Geo-slope SEEP/W2D finite element method software. The Dam consist of an upstream blanket, 25m deep slurry cut-off wall,which projects into the core and bedrock in the river sand; a grout curtain in under the cut-off wall in thefoundation cement and chemical grouting of the river bed and bedrock and a relief well and horizontal draindownstream. Results showed that the annual seepage value at 37m maximum water level of STA 455 was31.2585 m3/year with the cutoff wall while 511.4825 m3/year was recorded without the cutoff wall, the seepagevalue is far too high compared to the value with the cutoff wall in place. To ensure dam safety and villages atdownstream area, it is recommended to use cut-off wall which helps in reducing seepage values. Routineinspections must be carried out by assigned personnel to check against dam break.
机译:大坝是任何现代社会的基本要素,具有巨大的经济价值。然而,它们存在潜在的灾难性失败风险,这主要归因于渗透。为了控制渗漏,使用地理斜率渗透/ W2D有限元方法进行分析了具有STA 455的大坝中间部分处的坝截止壁的效果。坝组成了上游毯子,25米深浆料切断墙,将河砂岩中的芯和基岩突出;灌木丛中的灌木窗帘,在河床和河床和基岩的化学灌浆和浮雕井和水平漏洞中。结果表明,37米的渗流值为37米的STA 455的水位为31.2585 m3 /年,截止墙为511.4825 m3 /年,没有截止墙,与截止值相比,渗流值远得太高了墙到位。为确保大坝安全和村庄Atdownstream区域,建议使用截止墙,这有助于减少渗漏值。必须通过指定的人员进行常规方法来检查大坝休息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号