Estimation of different wind characteristics parameters and accurate wind resource assessment for Kadavu, Fiji

机译:斐济Kadavu的不同风力特征参数和准确风力资源评估的估算

获取原文
           

摘要

Wind resource assessment is carried out for a site in Kadavu, Fiji Islands. This included estimating the Weibull parameters and wind power density using ten different methods and carrying out an economic analysis. The wind speeds at 34 m and 20 m above ground level, wind direction, atmospheric pressure and temperature were measured for 18 months and statistically analyzed. The overall average wind speed at a height of 34 m above ground level was found to be 3.63 m/s. The seasonal averages for the site were 3.81 m/s and 3.40 m/s for summer and winter respectively. The diurnal variation of the wind shear for the site was correlated with the temperature variation. The Moments Method was found to be the best method for the entire period of study. The Modified Maximum Likelihood Method was found to be the best for the summer season whilst Median and Quartile method was the best for the winter period. The mean wind power density at the location was found to be 45.88 W/msup2/sup. The WAsP software was used to create the wind resource map. Five potential sites were selected installing the wind turbines and for carrying out the economic analysis, which included an estimation of annual energy production. It was found that, for the five turbines average capacity factor would be 20.05%. The payback period for installing the wind turbines at 50 m above the ground level is estimated to be between 6.99 and 8.74 years.
机译:风力资源评估为斐济群岛卡达瓦的一个地点进行。这包括使用十种不同方法估计Weibull参数和风力电力密度,并进行经济分析。在地上34米和20米处的风速,风向,大气压和温度测量18个月并进行统计分析。发现地面34米高度的平均风电速度为3.63米/秒。夏季和冬季,该网站的季节性平均值分别为3.81米/秒和3.40米/秒。该部位的风剪的昼夜变化与温度变化相关。发现矩的方法是整个研究时期的最佳方法。发现修改的最大似然方法是夏季最适合炎热的,而中位数和四分位数的方法是冬季的最佳状态。发现该位置的平均风力密度为45.88W / m 2 。 WASP软件用于创建风资源地图。选择五个潜在地点安装风力涡轮机并进行经济分析,其中包括年度能源生产的估计。发现,对于五个涡轮机平均容量因子为20.05%。安装风力涡轮机的投资回收期在地面50米处估计为6.99和8.74岁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号