Research on the Reinforcement Mechanism and Safety Monitoring of Heavy-Duty Concrete-Encased CFST Columns

机译:重型混凝土封装CFST柱加固机理及安全监测研究

获取原文
   

获取外文期刊封面封底 >>

       

摘要

With the reinforcement project of a heavy-duty concrete-encased concrete-filled steel tube (CFST) column as the background, the mechanism of column reinforcement with supporting beams is proposed. The key mechanisms include the following: (1) designing the upper and lower corbel-shaped temporary support columns, (2) crack repairing the inner steel pipe using patch-shaped steel plates, and (3) replacing microwound concrete inside the steel pipe, which are all innovative and effective methods. Moreover, a system is developed for monitoring the safety during the reinforcement process and recovering the bearing capacity of the concrete-encased CFST column. The monitoring results indicate that the load conversion process of the temporary support columns lasts for 50 days, that the sum of the axial forces of the four supporting columns is 7,966.0?kN, accounting for 65% of the standard load, and that during the whole process, the structural components are safe and reliable. Finally, the construction simulation is in agreement with the field test results, which proves that the construction simulation developed based on the theory of slow time-dependent mechanics and the method of static nonlinear analysis is accurate.
机译:随着重型混凝土封装的混凝土(CFST)柱的加固项目作为背景,提出了用支撑梁的柱加强机构。关键机制包括以下内容:(1)设计上部和下部的临时支撑柱,(2)使用贴片钢板修复内钢管的裂纹,(3)更换钢管内的微孔混凝土,这是全部创新和有效的方法。此外,开发了一种系统,用于监测加固过程中的安全性,并回收混凝土封装的CFST柱的承载力。监测结果表明,临时支撑柱的负载转换过程持续50天,即四个支撑柱的轴向力的总和为7,966.0?KN,占标准负载的65%,而整体工艺,结构部件是安全可靠的。最后,施工模拟与现场测试结果一致,证明了基于缓慢时间依赖性机械理论和静态非线性分析方法开发的施工模拟是准确的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号