The Causes and Effects of Delay of Building Construction in Ethiopia, Southern Nation Nationalities of People Region in Gurage Zone (Case of Wolkite Town)

机译:古罗地省人口地区埃塞俄比亚建筑建设延迟延迟的原因及影响(狼推车案例)

获取原文
           

摘要

Construction projects are successful, when it is completed on schedule with in the agreed budget, expected quality level according to the specification otherwise it leads to so many problem. More than 70% of projects fail or are challenged to achieve their planned objective (Standish Group, 2015).This study identifies the cause and effect of delay of building construction in Sothern nation nationality of people state in case of Gurage zone. The study was conducted by using mixed (quantitative and qualitative) methods of research and a 1 to 5 likert scale questionnaire survey together with focus group were used. A total of 35(thirty-five) questionnaire were distributed and collected from clients, contractors and consultants and two focus group discussion were held to identify the cause and effects of delay factor. The questionnaire were analysed and calculated in degree of severity, frequency of occurrence and importance index. The analysis result showed that the top 10 (ten) causes of delay of BCP in importance index (II%) were economic condition (inflation, currency and LC), fluctuation in price of material, time overrun of the project, slow decision making, improper planning, lack of finance to fund the project completion, preparing incomplete bill of quantity, delay in approval of payment, shortage of material, and change in drawing and design respectively. The top five effect of delay of BCP in importance index were increase in financial cost of project (budget overrun), time overrun of the project, poor quality of completed project, abandonment of building projects, and wastage and underutilization of human resources and materials.
机译:建设项目成功,当时按照商定的预算完成,预期质量水平根据规范,否则会导致这么多问题。超过70%的项目失败或受到挑战,实现了他们的计划目标(Spearish Group,2015年)。本研究确定了古古人民州人民国籍延迟建设的原因及影响。该研究通过使用混合(定量和定性)的研究方法进行,使用1至5个李克特量表调查调查,与焦点组一起进行。共有35名(三十五岁)问卷分发并从客户中收集,承包商和顾问和两个焦点小组讨论,以确定延迟因素的原因和影响。分析问卷,在严重程度,发生频率和重要性指数的程度上进行分析和计算。分析结果表明,BCP的十大(十)延迟的重要性指数(II%)是经济状况(通货膨胀,货币和LC),物质价格波动,项目的超额溢出,决策缓慢,规划不当,缺乏金融资金资助项目完成,准备不完整的数量,延迟支付,材料短缺,分别改变绘图和设计。 BCP延迟在重要性指数中延迟的前五个效果是项目的金融成本(预算超支),项目的时间超支,完成的项目质量差,放弃建筑项目,人力资源和材料的浪费和未充分利用。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号