The selection of methods for strengthening of the reinforced-concrete structure of the open tank

机译:开放式罐加固混凝土结构的选择方法

获取原文
           

摘要

The paper presents the solution to the selection of methods for strengthening a reinforced concrete wall of an open tank structure, located in a sewage treatment plant. Originally, this construction was reinforced with three massive retaining blocks topped with a beam. The reason for designing additional reinforcement of the wall structure was the damage in the form of cracks parallel to external walls observed during the implementation of the tank tightness testing in 2002. The measured cracks had a variable width up to 4.1 mm. The cause of the resulting damage was insufficient cross-section of the bottom plate reinforcement in the areas of connection with the walls. During the expansion of the sewage-treatment plant in 2014, additional bioreactor tanks were designed in the vicinity of existing retaining blocks. This implied the necessity to remove the supporting, retaining blocks and to make a new reinforcing structure. Several strengthening solutions have been analysed taking into account the continuous operation of the sewage treatment plant as well as the design variants that do not interfere with the interior of the existing tank chamber. A solution in the form of a support structure anchored on a palisade of bored piles was adopted.
机译:本文介绍了加强污水处理厂的开放式罐结构钢筋混凝土墙的方法的解决方案。最初,这种结构加强了三个巨大的挡泥块,顶部搭接梁。设计墙体结构额外加强的原因是2002年在实施罐密封性测试期间观察到的外壁的裂缝形式的损坏。测量的裂缝具有高达4.1mm的可变宽度。由此产生的损坏的原因在与墙壁连接的区域中底板增强的横截面不足。在2014年污水处理厂的扩建过程中,额外的生物反应器罐设计在现有的挡泥块附近。这暗示了消除支撑,保留块和制造新的加强结构的必要性。考虑到污水处理设备的连续运行以及不干扰现有罐室内部的设计变体进行了几种加强解决方案。采用锚定在钻孔桩上的支撑结构形式的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号