首页> 外文期刊>MATEC Web of Conferences >Measurement of the intensity of construction and installation works taking into account the level of organizational and technological reliability
【24h】

Measurement of the intensity of construction and installation works taking into account the level of organizational and technological reliability

机译:考虑到组织和技术可靠性水平的建筑和安装工程强度的测量

获取原文
           

摘要

In the work of the object of study, organizational and technological reliability (OTR) is presented as the ability of the construction process to maintain a specified (design) value of the intensity of construction and installation works (CIW). The subject of the study is the scope of OTR. The use of the indicator "probability of achievement of the set values of intensity of CIW" for planning of growth of productivity of work is capable to significantly increase reliability of the planned development, including taking into account the last achievements of science and technology. The aim of this work is to consider options for modifying the intensity of CIW based on the specific OTR. To achieve the goal, we tackled the problem of assessing the influence of methods of curve plotting cumulative probabilities for the rate of change of intensity of construction, and also showed alternative plans for the growth of labor productivity taking into account OTR. As a result of the study, the author comes to the conclusion about the identity of the probability of achieving a given level of intensity of production of CIW and the duration of construction of buildings and structures. Examples of alternative planning of productivity growth taking into account OTR are considered. The influence of the construction method of the curve of accumulated probability on the growth rate of intensity of production of CIW is proved.
机译:在研究对象的工作中,组织和技术可靠性(OTR)被提出为施工过程维护建筑工程强度(CIW)的指定(设计)值的能力。研究的主题是OTR的范围。使用指标“CIW强度设定值的概率”,用于规划工作的增长,能够显着提高计划发展的可靠性,包括考虑到科技的最后一切成就。这项工作的目的是考虑基于特定OTR修改CIW强度的选项。为了实现目标,我们解决了评估曲线绘制累积概率的方法对建设强度变化率的影响的问题,并显示了劳动生产率的增长考虑到OTR的替代计划。由于该研究的结果,作者结束了达到CIW的给定生产水平和建筑物和结构建设持续时间的概率的结论。考虑了考虑OTR的生产率增长的替代计划的例子。证明了累积概率曲线曲线施工方法的影响证明了CIW生产强度增长率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号