Fractal-COSYSMO Systems Engineering Cost Estimation for Complex Projects

机译:分形-COSYSMO系统工程项目造价估算

获取原文
       

摘要

Cost estimation for engineering projects has advanced beyond the bottom-up counting of costs and the top-down use of analogies. Parametric cost estimation is now employed to estimate volatile software costs, as well as the cost of Systems Engineering (SE) effort in engineering projects. The Constructive Systems Engineering Cost Model (COSYSMO) estimates the number of Person-Months (PM) necessary to complete systems engineering projects by using project size and cost parameters. On re-examining the nature of systems engineering and the structures of complex projects that must be built in an orderly fashion on a variety of scales, it is apparent that a parametric formula that employs fractal dimensionality principles should be well suited for their cost estimation. This thesis therefore develops the connections between fractal dimensionality and cost estimation with COSYSMO. The result is Fractal-COSYSMO, a novel cost estimating formulation that can be used to determine the cost of developing systems that show complexity on a broad scale.
机译:工程项目的成本估算已经超出了自下而上的成本计算和自上而下的类比使用。现在使用参数成本估算来估算易变的软件成本,以及工程项目中系统工程(SE)工作的成本。建设性系统工程成本模型(COSYSMO)通过使用项目规模和成本参数来估算完成系统工程项目所需的人月数(PM)。在重新审查系统工程的本质以及必须在各种规模上有序地构建的复杂项目的结构时,很明显,采用分形维数原理的参数公式应非常适合其成本估算。因此,本文建立了分形维数与使用COSYSMO进行成本估算之间的联系。结果就是Fractal-COSYSMO,这是一种新颖的成本估算公式,可用于确定开发显示出大规模复杂性的系统的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号