...
首页> 外文期刊>The Astrophysical journal >The Transit Light Curve Project. II. Two Transits of the Exoplanet OGLE-TR-111b*
【24h】

The Transit Light Curve Project. II. Two Transits of the Exoplanet OGLE-TR-111b*

机译:过境光曲线项目。二。两次系外行星OGLE-TR-111b *

获取原文
   

获取外文期刊封面封底 >>

       

摘要

As part of our ongoing effort to measure exoplanet sizes and transit times with greater accuracy, we present I-band observations of two transits of OGLE-TR-111b. The photometry has an accuracy of 0.15%-0.20% and a cadence of 1-2 minutes. We derive a planetary radius of RP = 1.067 ± 0.054RJup and a stellar radius of RS = 0.831 ± 0.031 R⊙. The uncertainties are dominated by errors in the photometry rather than by systematic errors arising from uncertainties in the limb-darkening function or the stellar mass. Both the stellar radius and the planetary radius are in agreement with theoretical expectations. The transit times are accurate to within 30 s and allow us to refine the estimate of the mean orbital period: 4.0144479 ± 0.0000041 days.
机译:作为我们为更精确地测量系外行星大小和飞行时间所做的不断努力的一部分,我们展示了OGLE-TR-111b两次飞行的I波段观测结果。测光法的精度为0.15%-0.20%,节奏为1-2分钟。我们得出行星半径RP = 1.067±0.054RJup和恒星半径RS = 0.831±0.031R⊙。不确定性主要由光度学误差决定,而不是由肢体变暗功能或恒星质量不确定因素引起的系统误差决定。恒星半径和行星半径均与理论预期相符。渡越时间精确到30 s以内,使我们能够完善对平均轨道周期的估算:4.0144479±0.0000041天。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号