...
首页> 外文期刊>MATEC Web of Conferences >Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
【24h】

Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city

机译:北干巴鲁市日产展厅,办公室和车间的时间加速分析

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Completion time determination in project management is among the first and the most important in the process of planning because it can be the basis for the whole planning. Project completion delay result in the elongation of construction time thus it can inflict a costly penalty due to the delays. Project management so important for implementation a project for avoid problem that can create disadvantages for owner or contractor, one of the problems that commonly occur in a project is a estimated cost and timework isn’t fit with the planning. Project construction Nissan, Office and Workshop at Pekanbaru City were late from contract duration. Work can more fast with 3 ways, alternative overtime work, alternative add more manpower, and alternative shift system. The analysis conducted focuses on unfinished work. Only work with critical path in analysis. Analysis result obtained cost of construction acceleration that caused by overtime alternative is IDR 15,393,542.00 overtime implemented for 4 hours in a day. Workers additional alternative that adjusted by field requirement result is IDR 25,500,000.00 and shift alternative, construction acceleration that caused by shift alternative is IDR 38,940,000.00. In conclusion, the most effective construction acceleration method is overtime alternative, obtained the minimum financial loss and recommended to use for the construction acceleration.
机译:在项目管理中,完成时间的确定是计划过程中的首要任务,因为它可以作为整个计划的基础。项目竣工延误导致施工时间的延长,因此由于延误而可能造成高昂的罚款。项目管理对于实施项目非常重要,它可以避免可能给所有者或承包商带来不利影响的问题,而在项目中经常发生的问题之一是估算成本,并且工作时间不适合计划。北干巴鲁市的日产,办公室和车间的项目建设比合同期限晚。可以通过3种方式更快地工作,另类的加班工作,另类的增加人力,以及另类的轮班制度。进行的分析集中在未完成的工作上。仅在分析中使用关键路径。分析结果得出的由加班导致的建设加速成本为IDR 15,393,542.00,每天实施4个小时的加班。工人根据现场需求结果调整的替代方案为IDR 25,500,000.00和移交方案,由移交方案引起的施工加速度为IDR 38,940,000.00。总之,最有效的施工加速方法是加班替代,获得最小的经济损失,建议用于施工加速。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号