首页> 外文期刊>MATEC Web of Conferences >Influence of the flooding speed of former lignite open pits on the stability of final slopes
【24h】

Influence of the flooding speed of former lignite open pits on the stability of final slopes

机译:前褐煤露天矿的注水速度对最终边坡稳定性的影响

获取原文
           

摘要

Flooding the residual gaps of former lignite open pits is often applied worldwide, offering opportunities for the use of the lake and the reclaimed land, as well as many benefits, ranging from the restoration of ecosystems to the development of the local economy. The flooding process is conditioned by the available quantities of water from natural and/or artificial sources. Flooding can be done either by natural methods (underground water inflow plus intake of water from rainfall and superficial drainage), or by natural and artificial methods (water adductions from superficial collectors). Unlike artificial flooding, natural flooding has the advantage of reduced costs, but it is a long-lasting process. Depending on the flooding speed, as a result of rising water level and saturation of rocks from the final slopes, geotechnical phenomena such as landslides may occur. The paper aims at establishing the dependence between the rhythm of raising the water level in the lake and the geotechnical behavior of the rock in the internal dump. Depending on this, there is a need to accelerate the flooding process through adductions, as the hydrostatic pressure manifested on the final slopes determines the increase of their stability reserve.
机译:淹没以前褐煤露天矿的剩余空隙通常在全世界范围内使用,这为使用湖泊和开垦土地提供了机会,并带来了许多好处,从生态系统的恢复到当地经济的发展。驱油过程取决于天然和/或人工来源的可用水量。可以通过自然方法(地下水流入量加上降雨和表层排水的取水量)进行洪水,也可以通过自然和人工方法(从表层集水器引水)进行洪水。与人工驱油不同,自然驱油具有降低成本的优势,但这是一个持久的过程。取决于洪水的速度,由于水位上升和最终斜坡的岩石饱和,可能会发生岩土工程现象,例如滑坡。本文旨在建立湖泊中水位升高的节奏与内部垃圾堆中岩石的岩土行为之间的依赖关系。取决于此,需要通过加合来加速驱油过程,因为最终斜坡上显示的静水压力决定了其稳定储备的增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号