Danger of underground erosion and sinking of the building of pumped storage energy plant in Zagorsk

机译:扎戈尔斯克的地下侵蚀和下沉的抽水蓄能电站大楼的危险

获取原文
           

摘要

Using the probabilistic approach, authors consider the case of development of a dangerous geological phenomenon i.e. the large underground erosive channel, induced by a mechanical suffusion during construction of the pumped storage energy plant in Zagorsk (PSEP-2). Formation of the erosive channel has led to the formation of cavities with the diameter up to 10 metres in the middle and upper-quarternary, suffusion-unstable, the fluvial-and-glacial and lake-glacial deposits of the Moscow and Dnieper moraine. Thin deposits were the bearing basis of the concrete construction of the dam of PSEP-2 in Zagorsk. The lack of proper consideration of difficult engineering-and-geological conditions and the subsequent formation of emptiness has led to the unilateral draft of the building of PSEP-2 in Zagorsk. Draft of the building of PSEP-2 in Zagorsk has detained the start-up of the building into maintenance and has resulted in significant economic damage.
机译:使用概率方法,作者考虑了在扎戈尔斯克抽水蓄能电站(PSEP-2)的建设过程中由于机械注水而引起的危险地质现象,即大型地下侵蚀通道发展的情况。侵蚀性通道的形成导致了中,上四分之一直径达10米的空腔的形成,莫斯科和第聂伯冰ora的河流和河流,冰河沉积物不稳定。薄薄的沉积物是扎戈尔斯克PSEP-2大坝混凝土施工的基础。缺乏对困难的工程和地质条件的适当考虑以及随后空虚的形成,导致了扎戈尔斯克PSEP-2建筑的单方面草案。扎戈尔斯克PSEP-2建筑物的草图已将建筑物的启动停工进行维护,并造成了严重的经济损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号