...
首页> 外文期刊>MATEC Web of Conferences >Operation and management of Liaoning waste water treatment plants by STOAT Simulation
【24h】

Operation and management of Liaoning waste water treatment plants by STOAT Simulation

机译:基于STOAT模拟的辽宁污水处理厂的运行与管理。

获取原文
           

摘要

Due to the irregular management, the effluent water of some waste water treatment plants (WWPT) of Liaoning province didn’t meet the demand of the National Discharge Standard. Meanwhile, excessive of dosage and discharge of sludge made the results of operation costs increasing and environmental pollution during the processes. The use of mathematical models for the simulationof wastewater treatment processes has gained widespread acceptance as a tool to aid the design of newworks and the optimization of existing facilities. STOAT developed by the Water Research Center is the most widely used model for simulating the WWST processes. This paper invited the STOAT as simulation model for the design and optimization of Liaoning waste water treatment plant.
机译:由于管理不规范,辽宁省部分污水处理厂的废水达不到国家排放标准的要求。同时,污泥的过量投加和排污导致了运行成本的增加和过程中环境的污染。将数学模型用于废水处理过程的模拟已被广泛接受,作为辅助设计新工厂和优化现有设施的工具。水研究中心开发的STOAT是模拟WWST过程最广泛使用的模型。本文邀请STOAT作为模拟模型,对辽宁污水处理厂进行设计和优化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号