首页> 外文期刊>MATEC Web of Conferences >Technical project of complex fast cycle heat treatment of hydrogenous coal preparation
【24h】

Technical project of complex fast cycle heat treatment of hydrogenous coal preparation

机译:氢煤制备复杂快速循环热处理技术项目。

获取原文
       

摘要

Problems of heat-treated milled hydrogenous coal preparation site creation in leading fast cycle heat treatment complex were considered. Conditions for effective use of electrostatic methods of heat-treated milled hydrogenous coal preparation were set. Technical project of heat treatment of milled hydrogenous coal preparation site was developed including coupling of working equipment complex on fast heat treatment and experimental samples of equipment being designed for manufacturing. It was stated that methods of electrical separation are used for heat-treated milled hydrogenous coal preparation with effective ways of organic and mineral components separation. Laboratory test for determination of optimal separation size sent into separators of heat-treated milled hydrogenous coal were made.Note to the reader: The identifier of the Framework Federal Program has been corrected on March 15, 2016.
机译:考虑了领先的快速循环热处理厂中热处理过的碾磨过的氢煤制备场所的产生问题。设置了有效使用静电方法的热处理过的磨碎氢煤制备的条件。制定了碾磨过的氢煤制备场的热处理技术项目,包括快速热处理的工作设备组合和正在设计制造的设备的实验样品的耦合。据指出,电分离方法用于热处理的磨碎含氢煤制备,具有有效的有机和矿物成分分离方法。进行了确定最佳分离尺寸的实验室测试,并将其送入热处理过的磨碎氢煤的分离器中。读者注意:2016年3月15日对Framework Federal Program的标识符进行了更正。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号