首页> 外文期刊>E3S Web of Conferences >Methodological approach to creation of the 3D model of an oval-shaped open pit mine
【24h】

Methodological approach to creation of the 3D model of an oval-shaped open pit mine

机译:椭圆形露天矿3D模型创建的方法论方法

获取原文
           

摘要

A 3D model of optimal contours phased development of oval-shaped open pit mines is proposed in the article. It is assumed that with enough accuracy the volumetric contour of the open pit mine is interpolated by an elongated elliptic hyperboloid. The calculation formulas for mineral resources are derived and optimal volumes of overburden are determined depending on the mining phase. In this case, the total number of mining phases is set in advance. The stripping ratio is used as a quality criterion of the optimization task. The problem of optimal control is solved using the Bellman function in dynamic programming. All the necessary calculation formulas are obtained in the final form by solving the optimization problem. Their simplicity and substantiation of each conclusion ensure that the results of this study can be successfully applied in practical calculations of the design and planning of mining operations in open pit mining.
机译:提出了椭圆形露天矿最优轮廓分阶段开发的3D模型。假定露天矿的体积轮廓以足够的精度由细长的椭圆双曲面插值。推导了矿产资源的计算公式,并根据开采阶段确定了最佳覆土量。在这种情况下,预先设定采矿阶段的总数。剥离率用作优化任务的质量标准。在动态编程中使用Bellman函数解决了最优控制的问题。通过解决优化问题,以最终形式获得了所有必要的计算公式。它们的简单性和每个结论的根据性确保了本研究的结果可以成功地应用于露天采矿开采设计和规划的实际计算中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号