首页> 外文期刊>E3S Web of Conferences >The German National Flood Protection Programme: Evaluating the impact of supraregional flood protection measures on extreme floods using hydrodynamic modelling
【24h】

The German National Flood Protection Programme: Evaluating the impact of supraregional flood protection measures on extreme floods using hydrodynamic modelling

机译:德国国家防洪计划:使用流体动力学模型评估超地区防洪措施对极端洪水的影响

获取原文
           

摘要

After the disastrous flood events of June 2013 in the German Elbe and Danube catchments, the German government together with the federal states decided on the joint elaboration of a nationwide flood protection programme (NHWSP, 2015-2027+). Within the frame of this programme, the government supports the realization of large-scale retention measures for the improvement of supra-regional flood prevention. For scientific monitoring, the Federal Institute of Hydrology (BfG) was mandated to conduct a two-part preparatory ad hoc study (2014-2015) and a subsequent research project (2015-2019) evaluating the collective impact of the planned retention measures on flooding processes and flood peak reduction in the Danube, Elbe, and Rhine basins. Findings from the ad hoc study provided the government with first elements of evidence for taking its decision on the elaboration of the NHWSP programme, and supported the development of a modelling strategy for the accompanying research project. By using extensive sets of hydrodynamic models, the research project takes into account the complex interrelations between supra-regional flood formation, flooding process, and retention control concepts when evaluating flood reduction on catchment level. It is expected to technically substantiate the government's NHWSP programme by refining the criteria for identification and prioritization of measures.
机译:在2013年6月德国易北河和多瑙河流域发生灾难性洪灾事件之后,德国政府与联邦政府决定共同制定一项全国性的防洪计划(NHWSP,2015-2027 +)。在该计划的框架内,政府支持实施大规模保留措施,以改善超区域防洪。为了进行科学监测,联邦水文研究所(BfG)受权进行两部分的专项准备研究(2014-2015)和随后的研究项目(2015-2019),以评估计划的保留措施对洪水的总体影响过程和多瑙河,易北河和莱茵河盆地的洪峰减少。临时研究的结果为政府就制定NHWSP计划做出决定提供了第一批证据,并支持为伴随的研究项目制定建模策略。通过使用广泛的水动力模型,该研究项目在评估集水区的洪水减少量时,考虑了超地区洪水形成,洪水过程和保留控制概念之间的复杂相互关系。预计将通过完善确定和确定措施优先级的标准,从技术上证实政府的NHWSP计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号