首页> 外文期刊>Journal of Modern Power Systems and Clean Energy >Reclosing scheme using synchronism checking for utilization of BESS in distribution system
【24h】

Reclosing scheme using synchronism checking for utilization of BESS in distribution system

机译:利用同步检查的重合闸方案在配电系统中利用BESS

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This paper proposes a reclosing scheme using synchronism checking for utilization of battery energy storage system (BESS) in a distribution system. The algorithm disconnects the faulty phase and keeps the power supply from the BESS to the healthy phase. Synchronism checking between the main source side and the load side is applied to minimize the transients at the reclosing instant. The BESS at the faulty phase is reconnected after checking the successful reclosing. The distribution system including BESS and proposed reclosing scheme are modeled by the electromagnetic transients program (EMTP)/ATPDraw. The various simulations by varing the fault clearing time are conducted and the simulation results are discussed. Also, the relation between proposed reclosing scheme and reliability is discussed.
机译:本文提出了一种基于同步检查的重合闸方案,以在配电系统中利用电池能量存储系统(BESS)。该算法将故障阶段断开,并使电源从BESS保持到正常阶段。在主电源侧和负载侧之间进行同步检查,以使重合闸瞬间的瞬变最小。检查成功的重合闸后,将故障阶段的BESS重新连接。通过电磁瞬变程序(EMTP)/ ATPDraw对包括BESS的配电系统和建议的重合闸方案进行建模。通过改变故障清除时间来进行各种仿真,并讨论了仿真结果。此外,还讨论了建议的重合闸方案与可靠性之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号