...
首页> 外文期刊>Jurnal RESTI: Rekayasa Sistem dan Teknologi Informasi >Penilaian Strategic Alignment Model (SAM) dan Pemetaan Kerangka Kerja COBIT 4.1 pada PT. XYZ
【24h】

Penilaian Strategic Alignment Model (SAM) dan Pemetaan Kerangka Kerja COBIT 4.1 pada PT. XYZ

机译:PT的战略调整模型(SAM)评估和COBIT框架映射4.1。 XYZ

获取原文
   

获取外文期刊封面封底 >>

       

摘要

PT. XYZ is a manufacturing company that produces Type I Portland cement and Portland Composite Cement. PT. XYZ has used IS/IT to support its business processes, but does not know the alignment model between IS/IT that has been used against the company's business strategy. PT. XYZ also does not know the maturity level of the application of the IS/IT. This is because there has never been an assessment of the alignment of IS/IT strategy to business strategy and has never done the maturity level measurement from the application of IS/IT. Measurement of the maturity level of application of IS/IT can be done if it is known what processes should be measured. For that reason, mapping is required using a specific framework. Assessment of alignment of IS/IT strategy to business strategy at PT. XYZ uses Strategic Alignment Model (SAM), while to know the process to be measured maturity level used framework COBIT 4.1. The result of this research is known the alignment model of IS/IT strategy to business strategy and IS/IT process which can be measured maturity level in the next step.
机译:PT。 XYZ是一家生产I型波特兰水泥和波特兰复合水泥的制造公司。 PT。 XYZ已使用IS / IT支持其业务流程,但不知道已将IS / IT与公司的业务策略对照使用的对齐模型。 PT。 XYZ还不知道IS / IT应用程序的成熟度。这是因为从未评估过IS / IT策略与业务策略的一致性,也从未进行过IS / IT应用程序的成熟度度量。如果知道应该测量哪些过程,则可以对IS / IT应用的成熟度进行测量。因此,需要使用特定的框架进行映射。评估PT的IS / IT策略与业务策略的一致性。 XYZ使用战略调整模型(SAM),而要了解要衡量的成熟度的过程则使用框架COBIT 4.1。这项研究的结果是已知的IS / IT策略与业务策略和IS / IT过程的一致性模型,可以在下一步中测量其成熟度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号