...
首页> 外文期刊>Journal of Science and Technology of Agriculture and Natural Resources >Providing a Comprehensive and Appropriate Strategy for the Construction of an Underground Dam Using the SWOT Model QSPM Matrix (A Case Study: Keriyan Watershed)
【24h】

Providing a Comprehensive and Appropriate Strategy for the Construction of an Underground Dam Using the SWOT Model QSPM Matrix (A Case Study: Keriyan Watershed)

机译:使用SWOT模型QSPM矩阵为地下大坝的建设提供全面而适当的策略(案例研究:Keriyan流域)

获取原文
           

摘要

Underground dams are structures built in underground and are capable of saving and making the underground water available. In this research, by using the SWOT analysis model, suitable locations were investigated for the development of an underground dam in the Keriyan area of Hormozgan province. At first, the necessary data and information were provided by visiting the region and presenting a questionnaire to the residents of the area and experts to investigate the strengths, weaknesses, opportunities and threats in the region for the underground dams. In the final step, by using the SWOT model and QSPM matrix, a comprehensive and appropriate strategy for underground dams was determined. The results showed that among the internal factors, not decreasing the volume of the reservoir due to deposits and reducing the evaporation from the reservoir with a final value of 0.85 and 0.66, and among the external factors, the willingness and cooperation of the relevant organizations and the disruption of downstream water rights with a final value of 0.68 and 0.66 had the greatest impact on selecting the strategy. Based on the results related to the internal and external factors, the strategy was placed in the maximum-maximum quadrant; in line with the strategy, by using the strengths and opportunities, the weaknesses should be overcome and the threats should be tackled. Some strategies were presented. In order to prioritize these strategies, the quantitative matrix QSPM was used. Finally, the hydrological, economic, social and environmental evaluating strategies of underground dams, before and after the construction, with a final score of 19.3 were prioritized.
机译:地下水坝是建在地下的建筑物,能够节省地下水并使其可用。在这项研究中,通过使用SWOT分析模型,研究了Hormozgan省Keriyan地区地下大坝开发的合适位置。首先,通过访问该地区并向该地区的居民和专家提供一份调查表,以提供必要的数据和信息,以调查该地区地下大坝的优势,劣势,机会和威胁。最后,通过使用SWOT模型和QSPM矩阵,确定了针对地下大坝的全面而适当的策略。结果表明,在内部因素中,没有因沉积而减少储层的体积,没有减少储层的蒸发,最终值为0.85和0.66,而在外部因素中,有关组织和机构的意愿与合作。下游水权最终值为0.68和0.66的中断对选择该策略的影响最大。根据与内部和外部因素相关的结果,将该策略放置在最大-最大象限中。根据战略,利用优势和机遇,应克服弱点,应对威胁。提出了一些策略。为了确定这些策略的优先级,使用了定量矩阵QSPM。最后,优先考虑了地下大坝建设前后的水文,经济,社会和环境评估策略,最终得分为19.3。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号